Skip to content
macro

EngineeringtoProduction

Know what will build.
Resolve what won’t.

Macro connects engineering changes to material readiness and to what your Tier 1 and Tier 2 suppliers tell you—so your team can see what threatens launch and production and coordinate the next move.

Early-stage · Building with design partners

Engineering change

ECN-218Approved

Rear mount bracket

Rev CRev D
Reason
Fatigue margin at mounts
Effective
WO-5533 onward
Owner
M. Okafor · Halden

Halden MotorsYour team

PLM

BOM · SA-7710

Updated3 lines change
ERP

Open production orders

3 affectedPlanned on rev D

Castell AutomotiveTier 1 supplier

Email

Rev C bracket inventory

420 bracketsCastell reply · no planned use
Email

Assembly · checking fixtures

No replyRev D updates · asked Oct 15

Norvik CastingsTier 2 supplier

Email

Rev D casting

UnconfirmedPPAP
Production milestoneNov 18

First rev D build

WO-5533 · 400 units · Line 2

At risk3 of 5 dependencies open
Next movesSuggested
  • Decide what happens to 420 rev C bracketsM. Okafor · HaldenDecision needed
  • Confirm rev D PPAP and capacityNorvik CastingsDraft ready
  • Follow up with Castell on fixture updatesCastell launch · by email6 days, no reply
Dependency traced Unconfirmed Company boundary
Fig.
01
Title
Change propagation
Data
Illustrative
01The problem

One change.
A hundred downstream consequences.

Revise one cast bracket and the effects reach parts, orders, inventory, suppliers, quality approvals, and the plant schedule. Each consequence is recorded in a different system—often at a different company.

Engineering changeApproved Oct 14

ECN-218Rear mount bracket

C → D

The distance between engineering and production is where plans break.

  1. 01Records are scattered

    Engineering data sits in PLM. Inventory and schedules sit inside your Tier 1’s systems, out of reach. Supplier commitments surface only when someone asks.

  2. 02Impact is found late

    The first sign of a missed dependency is often a line-side shortage or a slipped build date.

  3. 03Resolution is manual

    Closing out one change takes dozens of messages between teams that don’t share a system.

02Interactive concept

From change detected to issue resolved.

Explore how Macro is designed to work: trace an engineering change, check what’s clear to build, and coordinate recovery with your Tier 1 and Tier 2 suppliers—by email, the way they already work.

Trace a change to every part, order, and partner it touches.

Halden MotorsIllustrative data

SummaryECN-218 reaches 3 open production orders, 420 rev C brackets at Castell, and a new casting source. Five items are still open—two wait on Castell, one on Norvik—and the first rev D build on Nov 18 depends on them.

Engineering changes

4
ECN-218ApprovedOwner · M. Okafor · Halden chassis

Rear mount bracketRev C → D

Adds a rib at the bushing bore, thickens the mounting wall, and moves both mount bushings to 80 Shore A to restore fatigue margin under the 3 g pothole load case.

  1. ApprovedOct 14
  2. Released to CastellOct 15
  3. Tier 1 acknowledgedOverdue
  4. First rev D buildNov 18
Production orders affected
3
Rev C brackets in stock
420
Supplier PPAP pending
1
Manufacturing actions open
2

Impact map · select a node

Change

Changed parts

Downstream

Inspector

ECN-218 · Rear mount bracket

Approved Oct 14. Five downstream items are open; two depend on Castell, one on Norvik.

Source evidence

  • RecordOct 14, 16:02

    ECN-218 redline and approval

    Halden · PLM

  • RecordOct 15, 10:02

    Release package emailed to Castell

    Halden · Email

Resolution plan

Suggested · people decide
  • Needs decisionDue Oct 28

    Decide what happens to 420 rev C brackets

    Basis: 1,720 on hand at Castell; 1,300 consumed before the cut-in at WO-5533.

    • Use on WO-5536 under a deviation
    • Hold as service parts
    • Scrap
    HMM. OkaforApproval
  • Draft readyDue Oct 24

    Confirm PPAP date and capacity with Norvik

    Basis: Rev D castings for WO-5533 must ship by Nov 7 to meet the Nov 11 material release.

    HMJ. Sato
  • Waiting on partnerOverdue since Oct 17

    Castell to acknowledge ECN-218

    Basis: Released Oct 15 with a request to acknowledge. Castell’s only reply was a question on the mount bushings; WO-5533 material release is Nov 11.

    CAR. Lindqvist
  • OpenDue Nov 11

    Update assembly fixture, torque program, and checking fixture for rev D

    Basis: Rev D changes the bracket geometry and adds two datum features at the bushing bore. Castell hasn’t confirmed either update.

    CACastell launch · Quality
Ready At risk Blocked Unknown—never shown as ready
Fig.
02
Title
Interactive concept
Data
Illustrative · simulated

Synthetic scenario: Halden Motors, Castell Automotive, Pellam Components, Norvik Castings, and Kessel Fasteners are fictional. Every interaction is simulated in your browser. Nothing is sent, stored, or connected to a real system, and suggested actions stand in for decisions that people make.

03Capabilities

Know what’s ready.
Know what’s at risk.
Know what happens next.

Three views of the same record: what a change touches, what can build, and who needs to act—built from your systems and your partners’ replies.

01Engineering change intelligence

Understand what a change affects before it reaches production.

Macro traces a revision from the BOM to the parts, open orders, inventory, suppliers, and milestones it touches—so the impact assessment starts complete, not from memory.

Where-used
Assemblies, open orders, and service demand on the old revision
Old revision
Stock and work in progress, each with a decision and an owner
Cut-in
Effectivity, approvals, and Tier 1 acknowledgment tracked to first build
Where-used · MB-7710Rev C → D
Attributes that change between revision C and revision D
AttributeRev CRev D
Mounting wall4 mm6 mm
Bushings ×270 Sh A80 Sh A
Casting sourceTarnNorvik
  • MB-7710Cast bracket
  • SA-7710Mount sub-assembly
  • R7-RSFR7 Rear Subframe
  • WO-5533400 · Nov 18
  • WO-5536500 · Dec 2
  • WO-5540650 · Dec 9
  • SVC-07Service part
  • 420 pcsRev C stock · Castell
Affected by ECN-218 Not affected
Fig.
03
Title
Where-used trace
Data
Illustrative

02Production readiness

See which builds are clear, blocked, at risk, or awaiting evidence.

Readiness is calculated from your orders and BOMs, the commits your suppliers confirm, and the counts and holds your Tier 1 confirms—each asked for by email—not from on-hand totals or a general “on track.” Every call links to its source and shows its age.

Ready
Every check passes on current evidence
At risk
A confirmed gap, with time to recover
Blocked
A hold or gap that stops the build
Unknown
Evidence is missing or stale—never shown as ready
Readiness by check · R7 programAs of Oct 21, 09:40
  • WO-5521R7 Rear Subframe · Oct 30Ready
    Materials
    38/38 lines
    Revision
    Rev C
    Quality
    No holds
    Evidence
    45 min
  • WO-5524R7 Rear Subframe · Nov 4At risk
    Materials
    Link −1,200
    Revision
    Rev C
    Quality
    No holds
    Evidence
    45 min
  • WO-5530R7 Drive Unit · Nov 11Blocked
    Materials
    Bolt −330
    Revision
    Rev B
    Quality
    NCR-0412
    Evidence
    2 hr
  • WO-5533R7 Rear Subframe · Nov 18Unknown
    Materials
    No count
    Revision
    Ack missing
    Quality
    No holds
    Evidence
    9 days
  • WO-5536R7 Rear Subframe · Dec 2Unknown
    Materials
    Committed
    Revision
    Ack missing
    Quality
    No holds
    Evidence
    45 min
One missing acknowledgment leaves two orders unverified. Macro reports them as unknown, not ready.
Fig.
04
Title
Readiness by check
Data
Illustrative

03Cross-company resolution

Coordinate engineers, Tier 1s, and Tier 2s around the same issue.

Each issue carries its evidence, owners, and open questions. Macro drafts the questions for your Tier 1 and Tier 2 suppliers, your team sends them by email, and every answer lands on the issue.

One record
Every question, reply, and decision, in order
Email only
Partners reply as they do today: no portal, login, or integration
People approve
Production-critical decisions stay with accountable engineers

Issue record · ISS-0147

SL-4417 shortage · WO-5524

Awaiting receipt
  • HMHalden
  • CACastell
  • PCPellam
  1. 01Shortage foundCastell’s count: SL-4417 1,200 short for Nov 4Castell reply
  2. 02Pull-in requested1,200 pcs before the buildHalden → Pellam
  3. 03Supplier reply800 pcs Oct 30, 400 on Nov 10Pellam → Halden
  4. 04Recovery approvedNowSplit build: 800 Nov 4, 200 Nov 12Halden + Castell
  5. 05Receipt confirmedCastell to confirm the Oct 30 receiptCastell reply

On the record

Every ask, reply, and approval, dated

How partners take part

By email, when asked. Nothing to connect

Fig.
05
Title
Issue record
Data
Illustrative
04How Macro works

Your systems hold the data. Macro connects the decisions.

Macro is designed to sit across the tools you already run without replacing any of them, and to reach your partners the way they already work: by email.

  1. Bring together your PLM, ERP, and QMS records with partner replies from your inbox.

Fig.
06
Title
System overview
Data
Intended design

This describes the intended product experience. Integrations cover your own systems only and are scoped together, system by system; design partners can start from exports. Tier 1 and Tier 2 suppliers are never asked to connect anything.

Operating principles

Designed to be trusted with production decisions.

  • Complements your systems

    PLM, ERP, and QMS remain the systems of record. Macro reads from them and links the decisions between them.

  • Unknown is not ready

    Missing or stale information is reported as unknown—never as confirmed readiness.

  • People approve

    Engineers and operators approve production-critical actions. Macro prepares them and follows up.

  • Partners connect nothing

    Tier 1 and Tier 2 suppliers never open a system to Macro or log in. Macro asks by email and records what they answer.

05Integrations

Designed around the stack you already run.

Macro is being designed to read from your own systems, starting with these. Live connectors are built with design partners, in the order they need them—until then, partners start from exports. Your Tier 1 and Tier 2 suppliers connect nothing.

  • PLM & PDM

    BOMs, revisions, and engineering changes

    Status: Planned

    • TeamcenterSiemens
    • WindchillPTC
    • 3DEXPERIENCEDassault Systèmes
    • InnovatorAras
  • ERP

    Orders, plans, purchasing, and the inventory you hold

    Status: Planned

    • S/4HANASAP
    • Adaptive ERPQAD
    • Dynamics 365Microsoft
    • KineticEpicor
    • CloudSuite IndustrialInfor
    • PlexRockwell Automation
  • QMS

    Holds, NCRs, deviations, and PPAP status

    Status: Planned

    • RelianceETQ
    • EwQIMSOmnex
    • Plex QMSRockwell Automation
  • Email & chat

    Your team’s threads with your Tier 1 and Tier 2 suppliers, where every partner answer arrives

    Status: Planned

    • OutlookMicrosoft
    • GmailGoogle
    • TeamsMicrosoft
    • Slack
  • Exports

    Reports from your own systems, and spreadsheets partners attach to replies. Design partners start here.

    Status: Starting point

    • ExcelMicrosoft
    • SheetsGoogle
    • CSVAny system
  • Your Tier 1 suppliers

    Never connected, and no login. Macro drafts specific questions, your team sends them, and the Tier 1’s replies go on the record.

    Status: Email only

    • AcknowledgmentsEach released change
    • Stock countsParts a change or build needs
    • Material statusBefore each build
    • Holds and NCRsParts on open orders
    • Build reportsUnits, lots, serials
  • Your Tier 2 suppliers

    Never connected, and no login. Macro drafts specific questions, your team sends them, and the supplier’s replies go on the record.

    Status: Email only

    • Commit datesOpen POs and pull-ins
    • PPAPNew sources and revisions
    • Root cause8D on held lots
    • CertificatesConformance, by lot

Running something else? Tell us what your team runs. Design partners set the order we build connectors.

Become a design partner

Product names are trademarks of their respective owners. They are listed to show what Macro is being designed to read from, not to imply a partnership or endorsement.

06Industries

Built for the complexity of vehicle programs.

For automotive teams whose vehicles combine mechanical, electrical, and software revisions—and whose launches depend on Tier 1 and Tier 2 suppliers.

  • Plate 01Scale NTS
    U4J6ECU · REV D

    Vehicle electronics

    ECU and module revisions, allocated components, and approved alternates that ripple through Tier 1 builds, test, and supply.

    ECU revisions · Allocation · Alternates

  • Plate 02Scale NTS
    75MESH · Z14/Z19

    Powertrain and EV drive

    Long-lead castings, machined parts, and high-voltage components where a single shortage stops the line.

    Long-lead parts · HV components · Castings

  • Plate 03Scale NTS
    12345ITEM 2 · ENCODER DISK · 2048 → 4096 CPR

    Chassis and actuation

    Steering, braking, and actuator assemblies that combine machined parts, harnesses, electronics, and software—each with its own supplier and revision.

    Multi-tier BOMs · Harnesses · Software revs

  • Plate 04Scale NTS
    742J3 · REV B

    Body and assembly

    Model-year changes and tooling updates across stamped, molded, and trim parts, cut in on tight launch timelines.

    Model-year changes · Tooling · Launch cut-ins

Initial focus: automotive OEMs and Tier 1 suppliers—EV and powertrain programs, vehicle electronics, and chassis and body systems.

07Design partners

Build the future of manufacturing intelligence with us.

We’re partnering with engineering and operations teams to solve the problems that slow down physical product development and production.

  1. 01

    Start with one vehicle program or recurring workflow

    Pick a vehicle program, a Tier 1 supplier, or a change process that keeps slipping.

  2. 02

    Explore engineering changes and manufacturing readiness

    Begin with exports or historical data. Live connections to your own systems come later, on your terms. Your Tier 1 and Tier 2 suppliers don’t connect anything.

  3. 03

    Shape the product directly with the founding team

    Working sessions with the people building Macro. Your workflows set the priorities.

Who we’d love to hear from

  • VP Engineering
  • VP Manufacturing & Operations
  • Launch and APQP leads
  • Vehicle program managers
  • Supplier quality

Design partner inquiry

To the founders

Sent directly to the founding team. Used only to reply to you.