Viewing as Corvane · OEM

Corvane Semiconductor · Quality

Quality overview

All products · Final test · Week of Oct 5 – Oct 11

CV-7 first-pass yield · this week

93.9%

▼ 3.9 pts vs. 4-week baseline 97.8%

Units tested · all products

122.3K

122,330 units · 4 products

Open anomalies

2

1 high · 1 medium · 1 resolved this month

Connected sources

7

3 from partners · all healthy

First-pass yield · CV-7

Daily · final test

Anomalies

Detected by Macro
  • HighInvestigating

    CV-7 first-pass yield decline: Bin 7 continuity failures

    INV-0142 · opened Oct 6 · 18:40

    Investigate
  • MediumMonitoring

    CX-12 VOUT offset drifting toward upper spec limit on tester T-02

    INV-0139 · opened Oct 2 · 11:05

    Details
  • LowResolved

    CV-5 retest rate elevated on handler H-3

    INV-0137 · opened Sep 24 · 09:30

    Details

Products

This week vs. 4-week baseline
ProductPackageAssemblyFirst-pass yieldChange8-week trendStatus
CV-7 · Multi-rail PMICQFN-48Talus · Line 1, 393.9%−3.9 ptsExcursion
CX-12 · Gate driverTSSOP-20Talus · Line 296.8%−0.1 ptsWatch
CV-5 · LDO regulatorQFN-24Talus · Line 298.4%−0.0 ptsStable
CS-2 · Current-sense ampSOT-23-6Talus · Line 497.7%−0.1 ptsStable

Recent activity

Visible to Corvane
  • Oct 7 · 08:12Corvane · P. RamanTook ownership · INV-0142
  • Oct 6 · 18:40MacroOpened investigation · INV-0142 · CV-7 below lower control limit for 2 days
  • Sep 23 · 15:12Talus · D. OkaforApproved recurring share · EX-0388 · Monthly lot yield summary · Corvane